Let's talk

A Warm Welcome: STIEBEL ELTRON and the Future Homes Standard

Shortlisted, Construction Marketing Awards 2026, Strategic Planning & Management

The Future Homes Standard was expected in autumn 2025 and did not arrive until 24 March 2026. Rather than wait for it, STIEBEL ELTRON and Fabrick launched A Warm Welcome on 29 January, so that when the regulations landed, STIEBEL ELTRON was already the one explaining them.

The 12-page STIEBEL ELTRON guide Meeting New Standards with a Warm Welcome, written and designed by Fabrick

Where the knowledge gap was

From 24 March 2027, every new home in England must produce at least 75% less carbon than the 2013 standard. Gas boilers can't meet it; heat pumps can. Yet a 2024 survey by Architects' Datafile and Edge Insight found 46% of architects rated their understanding of Part L as no better than "acceptable" or "poor".

STIEBEL ELTRON, a heat pump specialist with a smaller market footprint than some of the major heating brands, chose to move early and teach. Together we picked a narrow audience: SME housebuilders delivering 50 or fewer homes a year, and the architects designing for them. Nobody enquires about a standard they haven't read, so the conversion we asked for was a CPD, a guide download or a consultation.

The A Warm Welcome landing page on the STIEBEL ELTRON website, headed Together, we're meeting New Standards with a Warm Welcome
The cover of the guide: Meeting New Standards with a Warm Welcome, for developers and architects

A plan written before the Standard existed

The plan set four long-term objectives, from 20 meetings with developers to three architect-led projects within 12 months. Those take 18 to 24 months to land, so Phase One was measured on the steps towards them: guide downloads, CPD registrations and consultation requests.

We wrote and designed a 12-page technical guide and built a landing page around it for CPD, event and consultation bookings. Audience data bought against specific job titles and organisations meant five emails to more than 20,000 people reached 87,000 contacts, with a 42.3% open rate and a 19.7% click-through rate. Three organic posts a week and paid LinkedIn, with separate creative for each audience, drove traffic to the page.

What the fortnightly reviews changed

Developer ad sets were less efficient, so we changed their bidding and paused the developer carousel. For architects, static creative earned a 27.78% higher click-through than carousel, so spend followed static. Architects produced 89% of website visits (297 of 335) and every paid-social guide download, so the budget moved to them. Phase Two takes developers off LinkedIn and onto Google Ads.

A STIEBEL ELTRON social post from the campaign: Specify today to safeguard tomorrow
A STIEBEL ELTRON social post showing an air source heat pump: Partner with STIEBEL ELTRON for an amazing choice in sustainable and innovative air source heat pump solutions

What Phase One delivered

From a £20,000 budget, Phase One produced around 50 requests for in-person CPDs against a proposal objective of 30 meetings, 160 online CPD attendees, 84 guide downloads and a project sale, early in a sales cycle that usually runs 18 months to two years. Campaign visitors stayed on the landing page for 1 minute 45 seconds on average, and one in five LinkedIn visitors downloaded a document, used a tool or stayed longer than two minutes. Phase Two starts in October 2026 with a larger budget.

  • 0

    Requests for in-person CPDs (around 50), against an objective of 30 meetings

  • 0

    Attendees at online CPDs

  • 0

    % of website visits came from architects (297 of 335)

  • 0

    Weeks ahead of the regulations: live on 29 January, published on 24 March

Other work

Let’s Talk Ideas

Leave your details below and one of our marketing and PR specialists will contact you to discuss how we can help.

Top